DMS 01 / 12
Hosting offer • 2026

Hosting
in North
Dakota.

Ready capacity for Bitcoin mining in North Dakota and Minnesota. Active air cooling, UL-certified builds, 24/7 monitoring.

17.7 MW
Available capacity
Competitive /kWh
Quoted per engagement
95%
Uptime
5
Live sites
SCROLL ↓
02
DMS 02 / 12
01 — Offer at a glance

Six numbers
worth knowing.

Capacity
17.7MW
Combined capacity across five sites
Rate
Competitive/kWh
Quoted per engagement, pay per consumption
Uptime
95%
MISO grid, stable ND power delivery
Cooling
Air/active
Containers winter-hardened for ND
Minimum order
Anysize
From a single miner to a full container
Support
24/7
Personal Foreman dashboard, direct line to ops
03
DMS 03 / 12
02 — Footprint

Five sites.
One operator.

Four live sites in North Dakota and Minnesota plus a Langdon build-to-suit pad with headroom for 10–15 MW.

DMS 04 / 12
Live • Grand Forks, ND
Site A — Grand Forks, ND

Grand
Forks.

6 MWCapacity
6Containers
OnlineStatus
  • Upstream Data 20-ft containers — all in production
  • Winter-hardened for ND: snow barriers, insulated walls
  • UL-certified, fully code-compliant
  • Ready for immediate miner placement
DMS 05 / 12
Moorhead containers Live • Moorhead, MN
Site B — Moorhead, MN

Moorhead.

4 MWCapacity
4Containers
OnlineStatus
  • Containers hashing right now
  • Snow-barrier build for MN winters
  • LAN fabric live, fleet monitoring wired in
  • Run by our in-house ops team
Moorhead detail Moorhead location Moorhead overview
DMS 06 / 12
Live • Bemidji-Scribner, MN
Site C — Bemidji-Scribner, MN

Bemidji-
Scribner.

6 MWCapacity
10Containers
240Slots per container
  • Ten active-air containers — our most recent deployment
  • 240 miner slots per container, dense layout
  • Single-phase PDU, per-miner metering
  • Bemidji, MN — live and operational
Scribner containers Scribner container interior Scribner container detail
DMS 07 / 12
Puposky site Live • Bemidji-Puposky, MN
Site D — Bemidji-Puposky, MN

Bemidji-
Puposky.

4 MWCapacity
4Containers
C19Power connector
  • C19 cables run to every rack
  • High-volume intake for active air cooling
  • Networking and hot-aisle rear panels included
  • Bemidji, MN — live and operational
Internal network routing C19 cable close-up Puposky overview
DMS 08 / 12
Build-to-suit • Langdon, ND
Site E — Langdon, ND

Langdon.
10–15 MW.

15 MWUp to
3 moBuild time
95%Uptime
  • Greenfield build-to-suit — capacity sized to your fleet
  • Order to power-on — about 3 months
  • Private land — buy outright or lease through the utility
  • 95% uptime backed by the utility
Langdon substation Langdon parcel Langdon location
09
DMS 09 / 12
03 — Commercial terms

No small print.
Everything on the table.

Setup fee
Quoted per engagement
Deposit
1 month
Prepayment
1 month
Contract term
12 months
Billing
Per consumption
Minimum order
Any size
Miners
Your own or buy from us
Monitoring
Foreman dashboard
Support
24 / 7 direct
Onboarding
Under 7 days
Rate
Competitive / kWh
Uptime
95% grid SLA
10
DMS 10 / 12
04 — Why North Dakota

Why
North Dakota.

01

Cold air — cooling on the house

Winter averages sit deep below freezing. Active-air containers run through the season without chillers: lower OPEX, more hashrate per kilowatt.

02

Stable MISO grid

Sites plug into the MISO market. Deep generation mix, predictable day-ahead pricing, decades of industrial-load delivery.

03

Miner-friendly state

North Dakota welcomes digital infrastructure. No state-level hostility, clean permitting path, local workforce within 100 km.

04

USD jurisdiction

Capital sits inside the US. Dollar contracts, no FX friction, full US legal standing.

DMS 11 / 12
05 — Who we are

Operators,
not landlords.

Digital Mining Solutions partners with operators who have built and run mining sites since 2017. From a single 1 MW container to 65 MW of live infrastructure in the US — every site built by the same hands: cable pulled, power energized, monitoring wired in.

Your miners are serviced by the same team that built the walls around them. No middlemen, no ticket queues — direct line to the people who actually do the fixing.

UL-Certified Builds MISO Grid 9 yrs in mining ND • MN • TX • AR
65 MW
Live fleet
9 yrs
In business
5
US sites
24/7
On-site ops
DMS 12 / 12
Ready to deploy?

Let’s lock in
your megawatts.

Get in touch with Digital Mining Solutions to discuss capacity, pricing, and onboarding timelines.

Email [ contact details ] Send inquiry →
Book a call [ contact details ] Pick a slot →
Telegram / chat [ contact details ] Open chat →